Steel structures & PEB for the Philippines · CIF & DDP delivery Philippine projectsContact Client portal dang.victor@worldsteelgroup.com +84 902 881 833
Philippines · Steel Structures & PEB
Steel-framed office headquarters building

Solution · Offices & BPO

Open floor plates for offices and BPO hubs

Steel-framed office buildings, IT-BPM hubs and headquarters with 12 to 15 metre column-free floors, generous service zones and Zone 4 seismic performance.

Request a quotationExplore the solution

12–15 m
Column-free spans
Zone 4
Seismic frames
Fast
Floor-by-floor erection
Composite steel floor beams in an office building

Floors tenants want to lease

IT-BPM locators and corporate tenants look for large, regular floor plates with few columns and room for services. Composite steel floors span 12 to 15 metres, and cellular beams let ducts and cables pass through the structure instead of below it – keeping storey heights down.

Lighter steel frames also reduce foundation cost on soft ground, which is common in coastal and reclaimed areas of Philippine cities.

Applications

Office buildings

01

IT-BPM hubs

Contact centres and shared services.

02

Corporate headquarters

Owner-occupied buildings.

03

Speculative offices

Lease-ready floor plates.

04

Mixed-use podiums

Retail below, offices above.

05

Vertical extensions

New floors on existing buildings.

06

Campus buildings

Training and support centres.

Codes & compliance

Designed for Philippine approval

The codes our engineers work to on Philippine projects – and the approvals your project team will obtain with our documents.

Philippines

  • NSCP 2015 Vol. 1National Structural Code of the Philippines – loads, wind (Sec. 207), seismic (Sec. 208) and steel design
  • AISC 360 / AISC 341Structural steel design and seismic provisions, as referenced by NSCP Chapter 5
  • AISI S100Cold-formed steel members – purlins, girts and eave struts
  • AWS D1.1Structural welding – procedures, welders and inspection
  • ISO 12944Corrosion protection by paint systems, by corrosivity category C2–C5
  • PD 1096 · RA 9514National Building Code and Fire Code of the Philippines (Revised IRR 2019)
Engineer of record
Plans and calculations signed and sealed by a Philippine-licensed civil or structural engineer for the building permit
Fire safety
Fire Safety Evaluation Clearance (FSEC) from the BFP before the permit; fire-resistance ratings per type of construction

Summary for orientation only – the project specification, the adopted code edition and the authority having jurisdiction govern.

Delivery terms · Incoterms® 2020

Delivered on the terms you need

World Steel quotes ex-factory, free on board or delivered to your port or site. Export packing, documents and shipment from Ho Chi Minh City are part of our service.

Compare all Incoterms® 2020 →

FAQ

Frequently asked questions

How is fire protection handled?

Members receive the rating required for the occupancy, usually with intumescent coatings applied in our plant.

Can you work with our architect's grid?

Yes. We optimise the steel within your architectural grid and coordinate with your engineer of record.

Ready to price your building?

Send the layout, the site location and your target date. We reply with a frame concept, steel tonnage and a CIF or DDP price.

Request a quotation +84 902 881 833