Featured United States

Solution · Multi-storey
Seismic-ready steel frames with composite floors – a faster, lighter alternative to cast-in-place concrete for Philippine buildings that must open on schedule.

Earthquake forces grow with a building's weight. A steel frame with metal deck floors weighs far less than a concrete frame of the same size, so foundations shrink and seismic demands drop – a real advantage on soft soils in Metro Manila, Iloilo or Davao.
Floors are erected without formwork, trades follow one storey behind the frame, and the building opens months earlier.
Applications
Classroom blocks built within a school year.
Long-span wards and service floors.
Open floors with few columns.
Shops below, offices above.
Repetitive floors that go up fast.
Codes & compliance
The codes our engineers work to on Philippine projects – and the approvals your project team will obtain with our documents.
Summary for orientation only – the project specification, the adopted code edition and the authority having jurisdiction govern.
Engineering
Columns and beams that need a fire rating are coated with intumescent fireproofing in our plant, with thickness records for the BFP.

FAQ
Material cost can be similar or higher, but faster construction, smaller foundations and earlier opening often make steel the cheaper project overall.
Where the fire safety plan requires a rating, yes. We engineer and apply it.
We design the steel frame and composite beams; the slab reinforcement can be designed by us or your engineer.
Send the layout, the site location and your target date. We reply with a frame concept, steel tonnage and a CIF or DDP price.
Delivery terms · Incoterms® 2020
World Steel quotes ex-factory, free on board or delivered to your port or site. Export packing, documents and shipment from Ho Chi Minh City are part of our service.
Compare all Incoterms® 2020 →