Steel structures & PEB for the Philippines · CIF & DDP delivery Philippine projectsContact Client portal dang.victor@worldsteelgroup.com +84 902 881 833
Philippines · Steel Structures & PEB
Welded built-up steel girders in the fabrication plant

Solution · Built-up members

Built-up steel: the right section for every metre

Welded plate girders, tapered rafters and box columns made in our plant – less tonnage than rolled sections for long spans and heavy loads.

Request a quotationExplore the solution

Tapered
Rafters & columns
Any depth
Plate girders
Automatic
Submerged-arc welding
Tapered steel rafter

Why weld your own sections?

Rolled sections come in fixed sizes; the design must jump to the next size up even where the force is lower. A built-up member is welded from plate to exactly the depth and thickness needed, and tapered where moments fall away.

On a typical portal frame building this saves a meaningful share of tonnage – which also lowers freight cost to the Philippines.

Applications

Where built-up members pay off

01

Portal frames

Tapered rafters and columns.

02

Transfer girders

Carrying columns over open floors.

03

Crane girders

Deep sections for heavy cranes.

04

Box columns

Heavy axial loads in multi-storey frames.

05

Long-span roofs

Deep, light girders.

06

Bridges and platforms

Plate girders to any depth.

Engineering

Plate girders and boxes

Plate girders reach depths no rolled section can, and box columns carry heavy loads in a compact footprint.

Steel plate girder

Codes & compliance

Designed for Philippine approval

The codes our engineers work to on Philippine projects – and the approvals your project team will obtain with our documents.

Philippines

  • NSCP 2015 Vol. 1National Structural Code of the Philippines – loads, wind (Sec. 207), seismic (Sec. 208) and steel design
  • AISC 360 / AISC 341Structural steel design and seismic provisions, as referenced by NSCP Chapter 5
  • AISI S100Cold-formed steel members – purlins, girts and eave struts
  • AWS D1.1Structural welding – procedures, welders and inspection
  • ISO 12944Corrosion protection by paint systems, by corrosivity category C2–C5
  • PD 1096 · RA 9514National Building Code and Fire Code of the Philippines (Revised IRR 2019)
Engineer of record
Plans and calculations signed and sealed by a Philippine-licensed civil or structural engineer for the building permit
Fire safety
Fire Safety Evaluation Clearance (FSEC) from the BFP before the permit; fire-resistance ratings per type of construction

Summary for orientation only – the project specification, the adopted code edition and the authority having jurisdiction govern.

FAQ

Frequently asked questions

Are built-up members as strong as rolled sections?

Yes. Welds are made by qualified procedures and tested, and the plate is mill-certified.

Do they cost more to make?

Fabrication costs more per tonne, but the tonnage saving usually outweighs it on medium and long spans.

Ready to price your building?

Send the layout, the site location and your target date. We reply with a frame concept, steel tonnage and a CIF or DDP price.

Request a quotation +84 902 881 833

Delivery terms · Incoterms® 2020

Delivered on the terms you need

World Steel quotes ex-factory, free on board or delivered to your port or site. Export packing, documents and shipment from Ho Chi Minh City are part of our service.

Compare all Incoterms® 2020 →